Customization: | Available |
---|---|
Weight: | 13-29kg |
Reuse Times: | 50 |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Property | Plastic formwork | Bamboo plywood | Wood planking | Steel formwork | Aluminium formwork |
Revolve times | 50 | 15 | 3-8 | 200 | 300 |
Single cost | 3 | 8 | 7 | 10.5 | 24 |
Auxiliary cost | 8 | Fastener steel pipe+wood batten 8 | Fastener steel pipe+wood batten 8 | Machinery cost\other cost 8 | 0 |
Formwork weight |
12kg/m2 | 10kg/m2 | 10.5kg/m2 | 35-40kg/m2 | 20-25kg/m2 |
Concrete surface quality | smooth | Roughness | Roughness | Roughness | smooth |
Labor cost one sq.m. | 37 | 37 | 37 | 26 | 28 |
Composite cost | 48 | 53 | 52 | 44.5 | 50 |
Fire resistance | Yes | No | No | Yes | Yes |
Corrosion resistance | Excellent | Bad | Bad | Bad | Excellent |
Release process | Easy | Moderate | Moderate | Difficult | Easy |
Release agent | No need | Need | Need | Need | Need |
Customized size | Yes | Cannot | Cannot | Cannot | Yes |
Recycle | Yes | Cannot | Cannot | Yes | Yes |
After Absorption | Non-deformation | Easy deformation and damage | Easy deformation and damage | Easy water absorption and rusting | Non-deformation |
Surface hardness | Common | Common | Common | High hardness | High hardness |
Environmental protection |
Non-pollution | Pollute the environment | Pollute the environment | Pollute the environment | Non-pollution |
Construction period (day/storey) |
6 | 6 | 6 | 7 | 4-5 |
Returned value | Common | No | No | No | High |
Other | Need twice plastering | Need twice plastering | Only suitable vertical wall | one-off pouring,no need plastering |